Kyrgyz

Massive Coal Stockpile at Bishkek HPP Exceeds 285,000 Tons

Bishkek Heating and Power Plant Stockpiles Coal and Fuel Oil for Winter Season

As of October 16, the Bishkek Heating and Power Plant has reported that they currently have 285,428 tons of coal and 2,917 tons of fuel oil stored at their facility. In preparation for the upcoming autumn-winter period and heating season, the plant aims to have a total of 1 million tons of solid fuel supplied.

The plant has assured that all equipment is functioning normally, and maintenance and repair work is being carried out as per the established schedule. The thermal schedule set by the Bishkekteploset municipal enterprise is being fully maintained at a comfortable +65 degrees.

With these preparations in place, the Bishkek Heating and Power Plant is ready to ensure a smooth and reliable energy supply throughout the colder months ahead.

 

Hostinger

Pools Plus Cyprus

This message was taken from this source and rewritten by artificial intelligence.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button